![]() ![]() SR2018 No 2: Specified Generator, Tranche B low risk, base load operation 0 – 2 MWth with high background NOx.SR2018 No 1: Specified Generator, Tranche B low risk, base load operation between 0 – 5 MWth.Medium combustion plant and specified generators SR2019 No 3: installation of water gates across a main river.SR2019 No 2: steps, ramps and other similar structures excavated into the existing bank profile of a main river.SR2019 No 1: installation of mooring pile in a main river.SR2015 No 38: removing 100 metres of exposed gravel from bars and shoals.SR2015 No 36: site investigation boreholes and temporary trial pits.SR2015 No 35: excavating a wetland or pond in a main river floodplain.SR2015 No 34: temporary scaffolding affecting up to 20 metres of a main river.SR2015 No 33: repairing and protecting up to 20 metres of main river bank.SR2015 No 32: installing an access culvert no more than 5 metres long.SR2015 No 31: channel habitat structure made of natural materials.SR2015 No 30: temporary diversion of a main river.SR2015 No 29: temporary storage on a flood plain of a main river. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |